An accessory dwelling unit, whether you call it an ADU, a casita or a guest house, is a full building in the eyes of your city or county. Before it can be built, a plan reviewer reads a set of drawings and decides whether the project meets the local rules. A permit-ready plan set is one a reviewer can read without guessing. Every jurisdiction publishes its own submittal checklist, so treat this as a general picture, not a substitute for the list your city or county asks for.
The site plan comes first
The site plan is where most ADU reviews start, because it answers the first question: does this building fit on this lot? It usually shows the property lines, the existing house and any other structures, the footprint of the new unit, and the distances from the ADU to each property line and to the other buildings. Those distances are the setbacks, and they are where many ADU projects succeed or stall.
A good site plan also shows easements, the driveway and parking, where utilities enter the property, and how water drains away from the buildings. If your lot is on a septic system instead of a sewer line, the reviewer will want to know how the new unit connects, and the county agency that oversees septic systems may ask for its own design. Our site planning work starts with exactly these questions.
Floor plan and elevations
The floor plan shows the rooms, their dimensions, the doors and windows, and the kitchen and bathroom fixtures. Reviewers check it for room sizes, exits and how the space will be used, so it has to be drawn to scale and fully dimensioned.
The exterior elevations show each side of the building: its height, the roof shape, the windows and doors as seen from outside, and the finish materials. Where a neighborhood has design standards or a homeowners association, the elevations are also what a design reviewer looks at. HOA approval is separate from the permit, so ask about it early.
Roof, sections and details
Most sets add a roof plan with slopes and drainage, building sections that cut through the structure to show how it is put together, and details for the parts a reviewer will ask about, such as wall assemblies, the foundation and the roof edge. These sheets turn a picture of a building into instructions a builder can follow and an inspector can check.
Structural, energy and systems information
Depending on the project and the jurisdiction, the set may also need structural information, electrical, plumbing and mechanical layouts, and energy notes. Some of this can come from other professionals, such as a structural engineer. Part of preparing the set is knowing which of these your jurisdiction expects, so nothing is missing on the first submittal.
Forms and supporting documents
Drawings are only part of the package. Expect an application form, owner information and authorization, and sometimes documents such as a recorded plat or an HOA approval letter. A complete package can go straight into review instead of waiting for missing pieces.
What slows an ADU review down
The usual problems are not design problems. They are sheets that disagree with each other, a site plan that does not match the real lot, missing dimensions, and comments that go unanswered. Each comment usually means revised sheets and another look from the reviewer, so a careful first submittal pays off.
How to prepare before drafting starts
Gather the property address, photos of the lot and the existing buildings, any drawings or surveys you already have, and a clear idea of how the ADU will be used. Check your HOA rules if you have an association. Then bring it all to a consultation.
NEAH Designs draws ADU plans for Arizona homeowners and prepares the submittal package. Our process page shows how a project runs, from the first call through reviewer comments. The city or county makes the approval decision; our part is a set it can read the first time.