Site planning · Phoenix and Arizona
The site plan, drawn the way reviewers read a lot.
Property lines, setbacks, the building footprint, driveways, easements and drainage notes, on one sheet for your city or county submittal. It starts with a look at the lot, at our office, on a call or on site.
- Serving Arizona since 2018
- Hablamos Español
- Phoenix office, projects statewide
Illustrative imageA site plan is the drawing of your whole property from above: the lot lines, the setbacks, where each building sits, the driveway, any easements and how water drains. NEAH Designs, an architectural drafting firm in Phoenix serving Arizona since 2018, prepares site plans for homes, ADUs, additions and commercial lots, drawn to the submittal rules of the city or county that will review them.
Updated 2026-11-23
- Serving ArizonaSince 2018
- ConsultationsCall, office meeting or site visit
- LanguagesEnglish and Español
- RepliesWithin 24 to 48 business hours
On the sheet
What a site plan shows, line by line.
Reviewers use the site plan to check that the project fits the lot and the rules that apply to it. These are the parts they look for first.
Property lines
The boundaries of the lot, with lengths and bearings from a survey or the recorded plat. Everything else on the sheet is measured from them.
Setbacks
The required distance between your buildings and each property line, drawn as a dashed line so a reviewer can see the building stays inside it.
The building footprint
The outline of every structure on the lot, existing and proposed, with its dimensions and its distance to the lot lines.
Driveways and access
Where vehicles enter the lot, the driveway and parking areas, and how they connect to the street or the alley.
Easements
Strips of the lot that others may use, often for utilities or drainage. Buildings generally cannot sit on them, so each one is labeled.
Drainage notes
Arrows and notes showing which way water runs across the lot, so new roofs and paving do not send runoff toward a neighbor.
When you need one
When does a city or county ask for a site plan?
Many building permits for new structures or added area need one. A city or county usually asks for a site plan when you build a new home, add an ADU or casita, expand the footprint of an existing house, file a zoning application, or change a commercial lot. Each jurisdiction publishes its own list, and we confirm yours.
Projects that usually start with a site plan
- A new home on a vacant lot
- An ADU, casita or detached garage
- An addition that changes the footprint of the house
- A zoning application or a variance request
- A septic system on a lot without sewer
- A new commercial building or a change to a commercial lot
Not sure? Bring the address and we check it with you.

The consultation
How we read the site before we draw it.
Before we meet
Send the address and anything you already have: a survey, an old site plan, photos or a parcel map. We look up the jurisdiction and the zoning district for the lot.
On the lot or at the table
We walk the property with you, or go over it in Suite 710 or on a call, noting existing buildings, the slope, where water collects, the driveway, utilities and anything that limits the new work.
What you leave with
A clear picture of how the project fits the lot, what the site plan needs to show, and whether a zoning, easement or septic question has to be answered first.
Plain words
Site plan terms, defined.
The words you will hear from us and from plan reviewers, and where each one shows on the sheet.
| Term | What it means | Where it shows on the plan |
|---|---|---|
| Setback | The minimum distance a building must keep from a property line. Front, side and rear setbacks come from the zoning district and can differ on the same lot. | A dashed line inside each lot line, with its distance |
| Easement | A recorded right for someone else, often a utility or a drainage channel, to use part of your lot. It stays with the property when it sells. | A hatched strip with its width and its purpose |
| Lot coverage | The share of the lot covered by buildings, measured from above. Zoning often caps it, which limits how large a new home, ADU or addition can be. | The site data table on the sheet |
| Footprint | The outline of a building where it meets the ground, including attached garages and covered patios when the jurisdiction counts them. | A solid outline with its dimensions |
Related services
Where the site plan leads next.
Before the drawingsZoning support
What your lot allows, and the application when one is needed.
After the drawingsPermit expediting
The site plan in a permit package, followed through review.
Casitas and guest housesADU plans
A second home on the lot, placed inside its setbacks.
Zoning and ADU door images are illustrative.
FAQ
Site plan questions, answered plainly.
How does a site plan handle a sloped lot?
On a sloped lot the site plan shows spot elevations or contour lines, which way the ground falls, and how the building and the driveway sit on it. Slope affects drainage notes, retaining walls and sometimes the height measurement zoning uses, so we note it at the site visit and draw it on the sheet.
Can a building sit inside a setback or on an easement?
Usually not without permission. Setbacks come from the zoning code, so building inside one generally needs a variance. Building over an easement usually needs the consent of whoever holds it, such as the utility. We show both clearly on the site plan so any conflict is found early, before the plans go to review.
What do you need from me to start a site plan?
The property address, the parcel number if you have it, and a description of what you want to build. A survey, an old site plan, a title report that lists easements, or photos of the lot all help. If you have none of these, we start from the address and the site visit.
Is a site plan the same as a plot plan?
In everyday use, often yes. Some jurisdictions say plot plan for a simpler drawing of the lot and the buildings on it, and site plan for a fuller sheet with grading, drainage and utilities. We draw whatever your city or county asks for and use its own name for it.
Do you prepare site plans for commercial lots?
Yes. Commercial site plans show the same basics as residential ones plus parking, drive aisles, accessible routes, trash enclosures and landscape areas when the jurisdiction asks for them. We prepare them for small commercial buildings and lots across Arizona and coordinate them with the rest of the drawing set.

Start your project
Book a consultation. Bring the address and the idea.
Tell us what you want to build and where. Choose a call, an office meeting or a site visit. The team replies to project inquiries within 24 to 48 business hours.
- Serving Arizona since 2018
- Hablamos Español
- Phoenix office, projects statewide
Book a Consultation
Name and phone are all we need to call you back. We will start from your site planning question.