Skip to contentNEAH DesignsEspañol602-281-5589Book a Consultation

ADU plans · Phoenix and statewide

ADU plans, drawn to fit the lot you have.

A casita, guest house or other accessory dwelling unit on a lot that already has a home. We draw the plan set, check the setbacks and the site fit, plan the utilities and prepare the permit package for your city or county.

  • Serving Arizona since 2018
  • Hablamos Español
  • Phoenix office, projects statewide
Plan sheets with a brass scale ruler and a pencil on a walnut desk in window lightIllustrative image

NEAH Designs draws ADU plans for Arizona homeowners who want a casita, guest house or other accessory dwelling unit on a lot that already has a home. The plan set covers the site plan with setbacks, the floor plan, elevations, the roof plan and the utility connections. We prepare and submit the permit package and answer reviewer comments, and the city or county decides on approval.

Updated 2026-11-23

  • ConsultationsCall, office meeting or site visit
  • LanguagesEnglish and Español
  • WhereProjects throughout Arizona
  • RepliesWithin 24 to 48 business hours

The plan set

What an ADU plan set includes.

The exact sheet list depends on your city or county, but most ADU submittals ask for the same core drawings.

  1. Sheet 01

    Site plan

    The whole lot from above: property lines, the main house, the new unit, the setback to each line, the driveway and walkways, and where the utilities run.

  2. Sheet 02

    Floor plan

    The rooms of the ADU drawn to scale, with dimensions, walls, doors and windows, kitchen and bath fixtures, and a label on each room.

  3. Sheet 03

    Exterior elevations

    Each side of the unit as it will look: heights, roof lines, windows, doors and exterior finishes, often matched to the main house.

  4. Sheet 04

    Roof plan

    Slopes, overhangs and drainage, and how the roof sits over the walls below. On a small building near a property line, this sheet matters.

  5. Sheet 05

    Sections and details

    Cuts through the building that show how the floor, walls and roof go together, with the construction details a plan reviewer looks for.

  6. Sheet 06

    Utility layout

    How water, sewer or septic, electric and gas reach the new unit from the existing services, on the site plan or on a sheet of its own.

A site plan sheet with contour lines glowing on a light table
Illustrative image

Setbacks and site fit

How much room does an ADU need on your lot?

It depends on the setbacks, the distances your city requires between a building and each property line, and on the space kept between the ADU and the main house. Easements, the driveway, a pool or large trees also take room. A site plan puts all of it on one drawing before the design is fixed.

What we check on the lot

  • Property lines and the setback to each one
  • Distance from the main house
  • Easements and buried utility lines
  • How much of the lot is already covered
  • Access from the street and the driveway
  • Pools, walls and trees that stay
More on site planning

Utilities

The services a second home needs.

An ADU ties into the services that already reach your lot. Planning those connections early shows whether the existing services can carry a second home, and where each line will run.

Some utility work needs input from the utility company or a specialist. We show it on the drawings and tell you early who else is involved.

Water
A new line from the existing service to the unit, and the route it takes across the yard.
Sewer or septic
A connection to the sewer, or on a lot without one, a septic system that accounts for the added home. See septic system design.
Electric
Power from the existing panel or a new service. The route is drawn, and the capacity of the existing panel is checked early.
Gas, heating and cooling
The gas line, if the unit uses one, and a place for the cooling and heating equipment, which also needs room on the site plan.

The permit path

From the first call to the permit counter.

Every jurisdiction runs its own review, but on most ADU projects the work happens in this order.

  1. Consultation and lot review

    We talk through the unit you want, then look at the lot, the main house and the zoning that applies to the property.

  2. Site plan and layout

    The site plan comes first, so the size and position of the unit fit the setbacks. The floor plan is drawn inside that footprint.

  3. The plan set and your review

    Elevations, the roof plan, sections and the utility layout follow. You review the drawings with us and we revise them.

  4. Submittal to the city or county

    We prepare the package your jurisdiction asks for and submit it for plan review.

  5. Reviewer comments

    If reviewers send corrections, we answer them and update the drawings. The city or county makes the approval decision.

FAQ

ADU plans, the questions we hear.

What is the difference between an ADU and a casita?

In everyday Arizona use, a casita is usually a small detached guest house. ADU, short for accessory dwelling unit, is the term many cities use in their codes for a second, smaller home on a lot with a main house. Whether a casita counts as an ADU depends on what it includes and on your city's definitions.

Can an ADU be attached to the main house?

Yes. An ADU can be a detached building, an attached unit with its own entrance, or a conversion of existing space such as a garage. Each type has different drawing needs. Attached units and conversions start with measuring the existing house, the same way our remodel and addition plans do.

Does my HOA need to see the ADU plans?

If the property is in a homeowners association, its covenants may require a design review of new structures, separate from the city or county permit. Check your HOA documents early. We can provide the drawings for that review, and it helps to know any HOA rules on height, materials or placement before the design is fixed.

What should I know about my lot before ADU plans start?

The property address, whether the house is on sewer or septic, where the water and electric services come in, and any survey or plot plan you already have. If some of that is missing, it is fine. The site visit and our site planning work fill the gaps before the design starts.

Sandstone and smooth stucco in low raking desert light

Start your project

Book a consultation. Bring the lot and the idea.

Tell us what you want to build and where. Choose a call, an office meeting or a site visit. The team replies to project inquiries within 24 to 48 business hours.

  • Serving Arizona since 2018
  • Hablamos Español
  • Phoenix office, projects statewide
Call 602-281-5589Pick a time on our booking calendar (opens the booking page in a new tab)

Book a Consultation

Name and phone are all we need to call you back. We will start from your ADU plans question.

Call 602-281-5589Book a Consultation